We've been MIA on Hodgson Tales for a few weeks now, but we're back with good news! We're packing up our duplex as I write and we're planning to move into the 909 House tomorrow! (This is obviously dependent on the work that gets done today: Grouting the tile, final polyurethane coat on the floors, drywall patching and a final cleaning.) But everything is on schedule now, so we hope to bring back good news in a few days to let you know that we've successfully moved in! Or, whenever we have Internet again.
Please keep us in your prayers ... that we're able to get everything that needs to be done in good time and that the work crews that are in and out of the house will do the same. Pray for good weather tomorrow as we move.
Hope to bring good news on!
Welcome to our blog! We're glad you've stopped by. With a three-year-old and our little babe, there's always something new and exciting going on. We're excited to share our adventures, joys and blessings with you along the way. Enjoy the journey with us!
Saturday, December 19, 2009
Wednesday, December 2, 2009
New House Pictures
Tuesday, December 1, 2009
The Countdown Begins ...
I can't believe I'm saying this .... But I think it's about that time to begin counting down the days until we move into the 909 House!! While this means we have to pack our stuff up again, pick up boxes and a lot more stuff at Brad's old work warehouse (yes, if you didn't know, he has a new job ... he's now the director of stewardship at vintage21 church :), and actually move, this is an exciting time.
Our contractor was busy with a few other jobs the last 2 weeks and wasn't around too much, but now that those jobs have come to a close, he's back in full force and he's ready to knock out the punch list. This means that the trim guys were back yesterday and today finishing up interior and exterior trim, our front porch columns arrived (yippee ... they look fantastic), were installed and primed today, the flooring guys were back to continue sanding the hardwoods, the HVAC guys were back to work on piping that needs to be fixed for the inspection and the electrician came back to install lights and electrical boxes. Our painter will begin his first coat on the exterior trim this week (weather permitting) and will follow with the rest of the exterior. And the flooring guy will finish sanding this week and will return this weekend to stain the floors. Our new windows are set to arrive early next week and once they come in, we'll have them installed (will take about 2 days).
From there, we're still waiting on the kitchen and powder room countertops to be installed, along with the corresponding powder room vanity and toilet. We're having the upstairs vanities built, but those should come around pretty soon and then we can order the countertops for those pieces. The hall bathtub still needs to be installed ... it's been sitting at our contractor's house for over a month ... but once that's installed, the tile guys can come back and finish tiling the hall bathroom and the plumber can come back and install all of our plumbing fixtures that won't be installed with the kitchen or powder room countertops. And as everything begins to wrap up the cabinet guy will come back to do final touches on our kitchen and mud room cabinets and our painter will go through the house one last time to touch up.
It seems crazy that all of this can happen in 1.5 weeks, but it's amazing to see these guys work. There seems to be so much forward planning, but once it's time to get the work done, it gets done very quickly (and with good quality). So for now, please pray for good weather so that we can continue to work on the exterior of the house and for diligence and a concern for quality as the work crews come in and out of the house the next 1.5 weeks so that we not only make our inspection & CO deadline (Dec. 11), but so that we can rest assured that the work was done well and will last.
(I'll post new pictures tomorrow.)
Our contractor was busy with a few other jobs the last 2 weeks and wasn't around too much, but now that those jobs have come to a close, he's back in full force and he's ready to knock out the punch list. This means that the trim guys were back yesterday and today finishing up interior and exterior trim, our front porch columns arrived (yippee ... they look fantastic), were installed and primed today, the flooring guys were back to continue sanding the hardwoods, the HVAC guys were back to work on piping that needs to be fixed for the inspection and the electrician came back to install lights and electrical boxes. Our painter will begin his first coat on the exterior trim this week (weather permitting) and will follow with the rest of the exterior. And the flooring guy will finish sanding this week and will return this weekend to stain the floors. Our new windows are set to arrive early next week and once they come in, we'll have them installed (will take about 2 days).
From there, we're still waiting on the kitchen and powder room countertops to be installed, along with the corresponding powder room vanity and toilet. We're having the upstairs vanities built, but those should come around pretty soon and then we can order the countertops for those pieces. The hall bathtub still needs to be installed ... it's been sitting at our contractor's house for over a month ... but once that's installed, the tile guys can come back and finish tiling the hall bathroom and the plumber can come back and install all of our plumbing fixtures that won't be installed with the kitchen or powder room countertops. And as everything begins to wrap up the cabinet guy will come back to do final touches on our kitchen and mud room cabinets and our painter will go through the house one last time to touch up.
It seems crazy that all of this can happen in 1.5 weeks, but it's amazing to see these guys work. There seems to be so much forward planning, but once it's time to get the work done, it gets done very quickly (and with good quality). So for now, please pray for good weather so that we can continue to work on the exterior of the house and for diligence and a concern for quality as the work crews come in and out of the house the next 1.5 weeks so that we not only make our inspection & CO deadline (Dec. 11), but so that we can rest assured that the work was done well and will last.
(I'll post new pictures tomorrow.)
Subscribe to:
Posts (Atom)
